CONSTRUCTION OF WWTP ON THE TERRITORY OF ZAGORKA AD BREWERY

CONSTRUCTION OF WWTP ON THE TERRITORY OF ZAGORKA AD BREWERY

v Implementation of a Detailed design for the site on all parts.

v Estimated water quantity Qavg/d = 2 000 m3/d.

v Maximum estimated water quantity Qmax.h = 125 m3/h.

v Population equivalent = 102 033 PE.

v Value of the site BGN 4 800 000.

The team of “WATER DESIGN” successfully implemented the assigned tasks and the project was apporved and commissioned.

Contracting authority:  ZAGORKA” AD

Start: 28-05-2015           

 End: 05-08-2019