Engineering of site „Reconstruction and replacement of existing water supply pipelines from PS II stage to PS III stage”

Engineering of site „Reconstruction and replacement of existing water supply pipelines from PS II stage to PS III stage”

Engineering of siteReconstruction and replacement of existing water supply pipelines from PS II stage to PS III stage”  (Length of the water supply pipeline two rivets with total length of 10,20 km, material – spherodial graphite cast iron, with diameters from Ø400 to Ø1000mm; Two transitions below a first  - class I-2 “Ruse – Razgrad” road). Designer supervision during the construction.

Project phase – Technical project  

Contracting authority: ViKOOD, Ruse

Start: 26-02-2021             

End: 18-10-2021